Calculate settlement and time using Terzaghi one-dimensional consolidation theory — free geotechnical engineering tool

Double DrainageSingle Drainage

S = H · Cc/(1+e0) · log((p0+Δp)/p0)

Tv = Cv · t / Hd²

Hd = H/2 (double drainage)

Input Parameters
Final Settlement
Final Settlement S
143.8 mm
(0.1438 m)
Drainage Path Hd
2.50 m
Consolidation vs Time
Degree U (%)TvTime t (days)Settlement (mm)
100.00794.914.4
200.031419.628.8
300.070744.243.1
400.125778.557.5
500.1963122.771.9
600.2863178.986.3
700.4029251.8100.6
800.5672354.5115.0
900.8481530.1129.4
951.1290705.6136.6
991.78131113.3142.3
Settlement Progress
10%
14.4 mm
20%
28.8 mm
30%
43.1 mm
40%
57.5 mm
50%
71.9 mm
60%
86.3 mm
70%
100.6 mm
80%
115.0 mm
90%
129.4 mm
95%
136.6 mm
99%
142.3 mm